On Saturday, September 16th 6-10 am WUSM Electricians will be turning off the power to the building on order to perform maintenance on the main electrical switchgear and equipment. This will affect all lighting and receptacle power throughout the building, for the duration of the outage. The generator serving the pharmacy areas will run and […]
News
Biotechnology Center-Restroom Services Interruption 9/4-9/6/2023
Sorry for the inconvenience please use restrooms located on the second or fourth floor.
McDonnell Pediatric Research Building-Fire Alarm Services Interruption 9/1/2023
Contractors/Facilities will be testing the Audio/Visuals for the fire alarm system in McDonnell Pediatric Research Building on Friday, September 1st 5-7 am. During this time, you will hear messages and see strobes throughout the entire building, occupants do not need to leave the building during this test.
East Building-Men’s Restroom Services Interruption 9/5-9/11/2023
Please pardon the inconvenience our team is currently working on repairs in the Men’s restroom. Please use the Men’s restroom on the floor above.
Biotechnology Center-Restroom Services Interruption 9/5-9/11/2023
Please pardon the inconvenience our team is making repairs in the restroom. Please use the restrooms on the second floor or fourth floor.
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit Services Interruption 9/11-10/16/2023
Starting on September 11th 5 am facilities will be making improvements to the HVAC system serving the lower level vivarium and BSL3 labs. The outage will be daily M-F starting at 5 am and will be completed by 7 am until October 16th 7 am. During this time NO work shall be conducted in the […]
Farrell Learning & Teaching Center-Steam Services Interruption 9/9-9/10/2023
To complete an installation of a new steam line there will be no steam to the building between September 9th at 12 am through September 10th 6 pm. This outage will affect heating to the building and may experience cooler than normal room temperatures during this timeframe. Facilities Engineering will adjust temperature setpoints to try […]
East Imaging Center-Women’s Restroom 3rd Floor Service Interruption 8/28-9/25/2023
The women’s restroom on the 3rd floor will be closed for work being completed above the ceiling.
CSRB North Tower Addition-Door Service Interruption Rooms 138 and 138A 8/31/2023
On Thursday, August 31st 8-11 am no work can be performed in rooms 138 and 138A. This outage is required for a department requested modification to the door that passes between these two spaces.
CSRB North Tower Addition-463-Animal Holding Light Fixture Service Interruption 8/17/2023
On Thursday, August 17th 7-9 am a lighting technician will be addressing an issue with a light fixture in 463-Animal Holding. No work may take place in the 454/463 ABSL3 suite during this outage.