Revised-Clayton Garage-Elevator Service Interruption 7/26/2023

As part of testing the newly installed generator, elevators in the Clayton Parking Garage will be tested on emergency generator power, from 6am to 7am, on Wednesday, July 26. During this time lighting and equipment connected to the emergency power system may experience a blip when power is transferred. The list that follows shows which […]

4511 Forest Park-Gas Service Interruption 7/22/2023

On July 22nd from 5 am to 2 pm there will be no gas to the 4511Forrest Park Building to replace seismic valves for the buildings gas meter. In these times there will be no gas to Bunsen burners, heating hot water, and domestic hot water.