Southwest Tower-Domestic Cold Water Service Interruption 5/26/2025

On Monday, May 26th, from 3 to 9 am, BJH Facilities will shut down the domestic water supply to the building to repair the backflow system. Both potable and non-potable water will be unavailable during this time. Labs and occupants may experience little to no water flow in restrooms, showers, kitchen break rooms, glass washrooms, […]

May 20-August: Barnard Exhaust Fan Replacement

Bernhard Engineering/ENFRA will begin investigating the entire Barnard exhaust fan #3 system throughout the building. This will consist of an ENFRA/Bernhard Engineer walking around the whole building and following the ductwork through the ceilings to create an as-built of the system. They will remove ceiling tiles and look above the ceilings as needed throughout the […]

May 20-June 9: BJCIH Utility Vault Roof Drain Routing on Euclid Avenue

Starting at 5 am on May 20th, Tarlton will begin work to route the new roof drain lines from the BJCIH utility vault to the city sewer system. This project includes saw cutting and removing a section of sidewalk and roadway along Euclid Avenue near the Central West End MetroLink. The saw cutting will occur […]