Sent on behalf of Barnes-Jewish Hospital. Please be aware that on March 8th, ArchKey will be working on the Medical Campus to conduct manhole-raising activities on Taylor, north of Forest Park (see the work location). Weather permitting, this work will be completed on Saturday, March 8th. All work will be done during the day shift, […]
News
March 7th – McDonnell Pediatrics Research Building (MPRB) Emergency Leak Repairs
Western Specialty Contractors has begun mobilization to perform emergency masonry repairs on the east elevation parapet wall above the 10th-floor windows and the north elevation return wall. The goal is to investigate and repair any deteriorated stone-to-stone joints that have allowed water to infiltrate the 10th-floor labs during rainfall. Western will block off the area […]
March 6 – Fall 2026: Steinberg Project Access Control and Parking on the East Side of Forest Park
Sent on behalf of Forest Park Forever. The Steinberg project has begun. The project site perimeter fence installation will be completed by the end of this week or early next week. Once this fence is installed, walking through the Steinberg site will be impossible. Instead, people parking west of Steinberg and walking east to gain […]
March 5th – Forest Park at Euclid Manhole Audit
Sent on behalf of Barnes-Jewish Hospital. Kaemmerlen Electric will work on the Medical Campus to conduct manhole audit activities on Forest Park at Euclid (see the work location). Weather permitting, the planned duration of this work is from Wednesday, March 5, through the close of business on Wednesday, March 19. All work will be done […]
March 10th – Forest Park: Potential Prescribed Burn
Sent on behalf of Forest Park Forever. If the current weather forecast holds for March 10, Forest Park Forever will conduct a prescribed burn in Forest Park between 8 am and 4 pm, including Deer Lake Savanna and Hidden Creek Savanna. If time and weather permit, we may also burn in Successional Forest or Kennedy […]
McDonnell Pediatric Research Building-Network Engine Service Interruption 3/13/2025
On Thursday, March 13th 6-7 am, Johnson Controls will modify the network engine that serves the MPRB-8201 BSL3 suite. Although there is no anticipated impact on HVAC performance, out of abundance of caution, NO work will be permitted in the BSL3 lab during the noted times.
CSRB North Tower Addition-Air Handling Unit Service Interruption 3/13/2025
On Thursday, March 13th from 4-6 am Facilities will shut down air handling unit NTAAHU4 and NTAAHU5 serving the 4th floor ABSL3 labs to take measurements needed for an active fan guard project. As a precaution NO work will be allowed within the 4th floor ABSL3 labs during the noted times.
McDonnell Medical Sciences Building-Electric Service Interruption 3/22/2025
On March 22nd, 6-10 am there will be an electrical outage to assist the electrical contractor working on the 9th floor renovation project. This outage will affect the 9th floor, penthouse, cooling tower, cooling tower heat trace, lighting, Air Handler 16, and Facilities radio service.
4560 Clayton Avenue-Domestic Cold Water 3/10/2025
On Monday, March 10th, from 2-6 am this outage will affect all hot and cold water to the building. Bathrooms, sinks, and any water-cooled equipment.
Steven & Susan Lipstein BJC Institute of Health – Air Handling Unit Service Interruption 3/8/2025
To help upgrade the VE air handling units and exhaust systems, facilities will shut down the wet lab units and exhaust on Saturday, March 8th, from 6-10 am. No fume hood work should be done during these times, lab personnel will also notice limited airflow as well. BTCF area will also be affected during these […]