Farrell Learning & Teaching Center, North Medical Building, Cancer Research Building, McDonnell Medical Sciences Building, East McDonnell Facility, Couch Biomedical Research Building, 4522 McKinley, Specialized Research Facility East, South Medical Building, Core@718Electric 6/2/2024

The purpose of this outage is to perform maintenance and testing on the ‘D’ feed portion of the McKinley Substation switchgear. Facilities electricians will perform switching in all affected buildings, to isolate and de-energize the ‘D’ feed. Facilities electricians and Service Contractors will inspect and test the breakers, relays, and major components of the de-energized […]

Southwest Tower-DI Water Service Interruption 4/8-13/2024

The 7th-floor DI water system has failed and will need to be repaired. Facilities will order parts and make necessary repairs. DI water is available on floors 6 and 8. The outage will be updated when the parts have arrived and installed.

McDonnell Pediatric Research Building-Hot Water Service Interruption 4/16/2024

On Tuesday, April 16th 6 am – 2pm in support of the construction project on the 10th floor, the heating hot water will be shut down for the 10th floor only. During this outage, the 10th floor may experience cooler than normal temperatures and will not have any negative affect to the air handlers, fume […]

Upcoming Sustainability Events

Lights Out Pledge Protects Migrating Birds In the spring and fall, birds migrate at night using the moon and stars to navigate. Light pollution from cities disorients birds, drawing them into the glow and causing them to waste valuable energy, often trapping them in a circle until dawn. How can you help prevent this? Throughout […]

Kingshighway utility work to conclude the weekend of April 5-8

Sent on behalf of Barnes-Jewish Hospital. Contractors will finish the utility work in northbound Kingshighway just north of Barnes-Jewish Plaza, which started last February. The work will start at 8 pm, Friday, April 5th and conclude by 6 am, Monday, April 8th. This work will NOT require a lane shift or detour; however, northbound Kingshighway […]

Core Apartments transitioned to new management on April 1, 2024

On April 1, 2024, the management of the Core Apartments located on the south side of the School of Medicine campus transitioned from Quadrangle Housing to the Operations & Facilities Management Department (OFMD). The Core Apartments offer fully furnished studio, one, and two-bedroom apartments at the 718 and 818 sites. The complex of historic buildings, […]

East Building-Chilled Water Service Interruption 4/13/2024

On April 13th from 4 am to 2 pm, there will be a chilled water outage for the East Building that will affect partial areas on the first floor. In this time, there will be limited to no cooling and air flow for the Cyclotron office, PET bay, scan rooms, and the MRI Bay all […]

CSRB North Tower Addition-Elevator Service Interruption 4/23-4/24/2024

The NTA elevators will be taken out of service, one at a time as needed, between 7 am and 4 pm, on Tuesday, April 23rd & Wednesday, April 24th. This will allow contractors to install new fire alarm devices in the elevator machine rooms, and in the top of the elevator hoist ways. This is […]