On Friday, January 26th 3:00 am – 8:00 pm contractors will be working on repairing the door to B147 in the B120 suite. During this time occupants can expect to hear construction noise in the basement vivarium area.
CSRB North Tower Addition-451/461 ABSL3 Suite Service Interruption 2/26/2021
On Monday, February 26th 6:00 am – 10:00 pm Johnson Controls will be replacing the network control engine that serves 451/461 ABSL3 suite. NO work may occur in the 451/461 ABSL3 suite during this outage. Other ABSL3 suites in the 4th floor biohazard area will be available during this outage.
CSRB North Tower Addition-432/442 ABSL3 Suite-Service Interruption 2/19/2024
On Monday, February 19th 6:00 am – 10:00 pm Johnson Controls will be replacing the network control engine that serves 432/442 ABSL3 suite. NO work may occur in the 432/442 ABSL3 suite during this outage. All other ABSL3 suites in the 4th floor biohazard area will be available during this outage.
Neuroscience Research Building-Vacuum Service Interruption 2/3/2024
The vacuum system for the NRB building will be out of service for upgrades and repairs on February 3rd 6:00 am – 3:00 pm. During this time anything attached to vacuum will not be in service. Please make sure that any experiments or equipment that uses vacuum is scheduled around this outage. Sorry for any […]
Renard tuck pointing extended
Between 6:30 pm and 2:00 am, Western Specialty Contractors continue performing tuckpointing and mortar repairs on the Renard Hospital facade. The work has been performed by swing stage and does not impact south dock operations, deliveries, or pick-ups. The project is weather dependent and continues to run when weather conditions are within the acceptable range […]
Northwest Tower facade cleaning continues
The swing stage is being moved to begin cleaning the west face of the building. The rigging will occur during the day and the cleaning process will occur during off-hours. The contractor will only clean the facade using high-pressure tap water (no chemicals). This work is weather dependent, and winter weather events have extended the […]
Extended – North Building roof replacement
On Saturday, January 27th, a mobile crane at the end of Scott Avenue near the east entrance of Farrell Learning & Teaching Center (FLTC) east entrance from 7 am to 12 pm to remove debris from the North Building roof. During this time, the south sidewalk heading west beyond Olin Residence Hall, the east Farrell […]
Newstead entrance of Newstead Garage will be closed Wednesday, January 24 from 6 am to noon for a terrace crane
On Wednesday, January 24th from 6 am to noon, there will be a terrace crane that will block the Newstead entrance of the Newstead Garage. The ramp at the top will also be blocked to avoid people getting stuck on the ramp. For any questions, please contact Mitch Snyder, Team Lead Senior Project Manager.
Steven & Susan Lipstein BJC Institute of Health-Hot Water Service Interruption 1/23/2024
On Tuesday, January 23rd 3 am – 2 pm contractors will be working on the heating hot water that serves half of the 11th floor. Some areas on the 11th floor may experience cooler than normal temperatures during this time.
McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 1/30/2024
On Tuesday, January 30th 5-8 am Facilities will turn off the air handler that serves the office spaces on the south side of the building to perform preventive maintenance. The offices on floors 2 through 12 will experience loss of airflow and cooler-than-normal temperatures.