Clinical Sciences Research Building, McDonnell Pediatric Research Building-Electric Service Interruption 12/4/2023 6-10 am

The purpose of this outage is to perform maintenance and testing on the 4160V switchgear that distributes power to the CSRB Chillers. This is the 1st of two outages to do this work. Facilities electricians will perform switching to isolate and de-energize the ‘D’ Feed portion of the switchgear. When all work is complete the […]

Specialized Interim Research Building, Specialized Research Facility East, Facilities Engineering Supply Room, Health Administration Planning-Electric Service Interruption 12/1/2023 7-11 pm

The purpose of this outage is to perform maintenance and testing on the main electrical switchgear that distributes power to SRF-East, as well as the outdoor Transformer that serves SIR. This is the 2nd of two outages to do this work. Facilities electricians will perform switching to single-line the SRF-East, main switchgear to the ‘D’ […]

McDonnell Pediatric Research Building-Elevator Service Interruption 11/27-11/28/2023

Elevators will be out of service between 5 pm and 9 pm, on Monday, November 27th, for testing fire service recall as required by Elevator Safety Unit of the Missouri Department of Public Safety, on the new fire alarm system. The elevators will be selected on a priority basis depending on customer needs and technical […]

West Building-Fire System Service Interruption 11/13-11/15/2023

Contractors and Facilities will be replacing the fire pump for the West Building November 13th-15th 7 am – 4 pm . During this time the building fire system will be on city water pressure only. No open flames or hot work will be permitted in the West Building during this time.

McDonnell Pediatric Research Building-Elevator Service Interruption 11/8-11/9/2023

PEDs Elevators will be out of service from 4 am to 7 am on Wednesday, November 8, and Thursday, November 9, for programming and testing new fire alarm devices in the elevator shafts. During this time, the passenger elevators in NTA should be used instead. The PEDs elevators will be returned to normal operation at […]