On Tuesday, November 14th 5-9 am there will be an outage that will effect the seventh floor up to the tenth floors that use compressed air for sterilizers in the BSL3 labs, air tables, fermentation room, glass washers, and autoclaves. No lab air will be available during this time frame.
Clinical Sciences Research Building, McDonnell Pediatric Research Building-Electric Service Interruption 12/4/2023 6-10 am
The purpose of this outage is to perform maintenance and testing on the 4160V switchgear that distributes power to the CSRB Chillers. This is the 1st of two outages to do this work. Facilities electricians will perform switching to isolate and de-energize the ‘D’ Feed portion of the switchgear. When all work is complete the […]
Specialized Interim Research Building, Specialized Research Facility East, Facilities Engineering Supply Room, Health Administration Planning-Electric Service Interruption 12/1/2023 7-11 pm
The purpose of this outage is to perform maintenance and testing on the main electrical switchgear that distributes power to SRF-East, as well as the outdoor Transformer that serves SIR. This is the 2nd of two outages to do this work. Facilities electricians will perform switching to single-line the SRF-East, main switchgear to the ‘D’ […]
McDonnell Pediatric Research Building-Elevator Service Interruption 11/27-11/28/2023
Elevators will be out of service between 5 pm and 9 pm, on Monday, November 27th, for testing fire service recall as required by Elevator Safety Unit of the Missouri Department of Public Safety, on the new fire alarm system. The elevators will be selected on a priority basis depending on customer needs and technical […]
East Imaging Center-Domestic Cold Water Service Interruption 11/11/2023
On Saturday, November 11th 4 am – 12 pm the plumbers will be installing new back-flow assemblies for the building. This will affect all the domestic water supply.
West Building-Fire System Service Interruption 11/13-11/15/2023
Contractors and Facilities will be replacing the fire pump for the West Building November 13th-15th 7 am – 4 pm . During this time the building fire system will be on city water pressure only. No open flames or hot work will be permitted in the West Building during this time.
East Imaging Center-Steam Service Interruption 11/4/2023
On Saturday, November 4th from 3 am to 3 pm the steam system in the East Imaging Center will be off for repairs to a leak. In this time there will be limited to no heating to entirety of the building.
McDonnell Medical Sciences Building-Vacuum Service Interruption 10/31/2023
On Tuesday, October 31st from 5 am to 9 am the vacuum system for the McDonnell Medical Sciences Building will be down for service. In this time frame there will be no vacuum to fume hoods and lab benches and anything else requiring vacuum in the building.
Neuroscience Research Building-Compressed Air Service Interruption 11/10/2023
On Friday, November 10th 6-7 am all lab compressed air in the building will be down for contractors to repair a leak.
McDonnell Pediatric Research Building-Elevator Service Interruption 11/8-11/9/2023
PEDs Elevators will be out of service from 4 am to 7 am on Wednesday, November 8, and Thursday, November 9, for programming and testing new fire alarm devices in the elevator shafts. During this time, the passenger elevators in NTA should be used instead. The PEDs elevators will be returned to normal operation at […]