On Thursday, September 21st 4 – 7 am to perform preventive maintenance facilities technicians will be shutting down exhaust fans serving BSL3 lab suites 7301,7303, and 8201 during the above-noted times. During this time NO work shall take place in the BSL3 labs.
REVISED-Biotechnology Center-Domestic Cold Water Service Interruption 9/9-9/10/2023
On Saturday, September 9th at 7 am to Sunday, September 10th at 12 am there will be a building wide domestic cold water outage for the Biotechnology Center building to replace the main water line coming into the building. In this time there will be no water to Restrooms, Lab sinks, RO/DI water, Lab Vacuum, […]
East Building, East Imaging Center-Entrance Service Interruption 9/1-9/2/2023
On September 1st from 8 pm to 6 am there will be partial access to the entrance of East Building and East Imaging building for ceiling removal. In this time there will be half access to the entry way to these buildings.
Southwest Tower-Drill Coring 9/11/2023
On Monday, September 11th 5-11 pm contractors will be core drilling on the 6th floor. Labs will experience noisy conditions along with slight vibration.
Renard Hospital, Barnard Hospital-Electric Services Interruption 10/1/2023
The purpose of this outage is to perform maintenance and testing on the main electrical switchgear on the 4th Floor Roof of Wohl Hospital, which serves the A/C equipment for the Cyclotron area. On Sunday, October 1st 7-11 am Facilities electricians will perform switching and de-energize the necessary switchgear so they can safely and effectively […]
CANCELED-1234 S. Kingshighway-Electric Services Interruption 9/16/2023
On Saturday, September 16th 6-10 am WUSM Electricians will be turning off the power to the building on order to perform maintenance on the main electrical switchgear and equipment. This will affect all lighting and receptacle power throughout the building, for the duration of the outage. The generator serving the pharmacy areas will run and […]
Biotechnology Center-Restroom Services Interruption 9/4-9/6/2023
Sorry for the inconvenience please use restrooms located on the second or fourth floor.
McDonnell Pediatric Research Building-Fire Alarm Services Interruption 9/1/2023
Contractors/Facilities will be testing the Audio/Visuals for the fire alarm system in McDonnell Pediatric Research Building on Friday, September 1st 5-7 am. During this time, you will hear messages and see strobes throughout the entire building, occupants do not need to leave the building during this test.
East Building-Men’s Restroom Services Interruption 9/5-9/11/2023
Please pardon the inconvenience our team is currently working on repairs in the Men’s restroom. Please use the Men’s restroom on the floor above.
Biotechnology Center-Restroom Services Interruption 9/5-9/11/2023
Please pardon the inconvenience our team is making repairs in the restroom. Please use the restrooms on the second floor or fourth floor.