To make repairs, no domestic hot water will be available to the building on June 10th 12 am-June 11th 4 pm. This will affect all restrooms, sinks, showers, and any system using domestic hot water. A follow-up notification will be issued when all repairs have been completed and the system is back to normal operation.
CSRB North Tower Addition-Steam Service Interruption 6/16-17/2023
On Friday, June 16th 4 pm – Saturday, June 17th 4 pm Facilities will be working on the steam system that feeds steam to the entire building. No steam will be available to all autoclaves. Hot water throughout the building will be cooler than normal during this time.
Mallinckrodt Institute Radiology-Elevator Service Interruption 6/4/2023
Elevator 102 will be out of service on Sunday, June 4, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption 6/18/2023
Elevator 103 will be out of service on Sunday, June 18, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 6/5-17/2023
A contractor will be cleaning a portion (the large vertical riser) of the supply air ductwork served by the laboratory supply air unit, AHU-2. This unit serves laboratories on the northeast and east side of the building (roughly half of the laboratory facilities in MPRB). To minimize the impact on the lab occupants, the contractor […]
CSRB North Tower Addition-Second Floor Men’s Restroom Service Interruption 6/1-2/2023
On Wednesday, June 1st 6 am- Friday, June 2nd 6 pm the 2nd floor Men’s Restroom (2046) will be closed for wall/ceiling repairs related to previous water damages.
Steven & Susan Lipstein BJC Institute of Health 6/5/2023
On Monday, June 5th 4-7 am Facilities will be working on the system that supplies lab air to labs located on floors 7 through 11 as well as the lower level vivarium. No lab air will be available during this time.
Steven & Susan Lipstein BJC Institute of Health-Vacuum Service Interruption 5/26/2023
Facilities will be working on the vacuum system that feeds labs 11203 through 11207. These labs will not have vacuum on May 26th 5-9 am.
Biotechnology Center-Compressed Air Service Interruption 5/18-26/2023
On May 16th at 7am there was a failure to the Lab Air system for the Biotechnology center. We are working on getting the system repaired. At this time there will be limited to now lab air to the building.
CSRB North Tower Addition-BSL3 Lab 434/445 Service Interruption 5/25/2023
In order for facilities to troubleshoot and repair a door issue BSL3 lab 434/445 will be out of service on Thursday, May 25th 7-9 am. During this time NO work shall take place inside the lab.