On February 2, from 7am to 5pm, a crane will be in operation to assist the contractor in installing cooling towers on the roof. During these times, access to the facility will be restricted for all personnel. Thank you for your patience during this time.
1/30: Mid Campus Center Limited Service Interruption, Electric
On January 30, from 10pm to 11pm, facilities electricians will replace a defective main breaker in panel LBK 102v/208v. This will affect the Wash U. bookstore receptacle, the Office area receptacles, and an IT server closet on the first floor. Southwest corner (Area in and around the bookstore).
1/29: Kaldi’s Café – Hibernation Rollout January 29th
Beginning January 29th, Kaldi’s Café will rollout their Hibernation menu, including: Make sure to visit one of the four café locations on campus (Mid Campus Center, Farrell Learning & Teaching Center, Fort Labs, and Werths Building @ Siteman Cancer Center) to check out these new offerings. More information and hours of operation can be found […]
1/27: SIRF, Limited Service Interruption, Exhaust Fan
On 1/27 from 6am-11am, Exhaust Fan 1 will be shut down for repairs. Only rooms 116 and 117 will be affected. Thank you for your patience during this time.
1/27: Cortex One, Planned Service Interruption
This is a revised outage start time for the software patch of the building network engine outage. The previous start time was 5:00 am. The new start time will be 4:00 am. It is anticipated that the building HVAC systems shall operate during this outage. Facilities Engineering will have staff present if there are any […]
1/28: CSRB – North Tower Addition, Planned Service Interruption
This is a revised outage start time for the software patch of the building network engine outage. The previous start time was 5:00 am. The new start time will be 4:00 am. It is anticipated that the building HVAC systems shall operate during this outage. Facilities Engineering will have staff present if there are any […]
1/29: Gary C. Werths Building at Siteman Cancer Center, Planned Service Interruption
This is a revised outage start time for the software patch of the building network engine outage. The previous start time was 5:00 am. The new start time will be 4:00 am. It is anticipated that the building HVAC systems shall operate during this outage. Facilities Engineering will have staff present if there are any […]
1/30: 4522 McKinley, Planned Service Interruption – Air Handling Unit
On 1/30 from 4am to 6am, there will be a software patch for the building network engine outage. The previous start time was 5:00 am. The new start time will be 4:00 am. It is anticipated that the building HVAC systems shall operate during this outage. Facilities Engineering will have staff present if there are […]
2/2-4/13: The Ellen S. Clark Hope Plaza Restoration – BJC Institute of Health (BJCIH) Front Entrance Vestibule and Sidewalk Closure, Pending Weather
As part of the Ellen S. Clark Hope Plaza Restoration, the construction team will perform plumbing, roofing, and finish upgrades to the BJCIH front entrance vestibule. In addition, the sidewalk leading to the front entrance will be replaced as part of the overall Ellen S. Clark Hope Plaza Restoration. Due to the disruption both pieces […]
1/26: Shell and Farmstead Cafes Closed Due to Inclement Weather
On January 26, the Shell and Farmstead Cafes will be closed due to inclement weather. All other locations are TBD at this time. If you have any questions, please contact Lauren Hurt, Assistant Director, Auxiliary Services, at laurenhurt@wustl.edu.