On Monday, September 30th, from 4-7 am, an Air Handling Unit outage will affect HVAC airflow on the east side of the building. Spaces can be used but will have limited temperature control. All fume hoods on the east side of the building will not have flow/exhaust. Please don’t use the fume hoods during this […]
McDonnell Medical Sciences Building-DI Water Service Interruption 9/25/2024
During this outage on Wednesday, September 25th 12 am – 8 am there will not be any DI water available on the 7th, 8th and 9th floors.
East Building-Elevator Service Interruption 11/1/2024-6/30/2025
Midwest Elevator will start the modernization project for elevators #47 and #48. One elevator will be taken out of service at a time to be modernized. Each elevator is expected to take approximately 14 weeks to complete.
Clayton Garage-Elevator Service Interruption 11/1/2024-3/31/2025
Midwest Elevator will begin work on the modernization project on Elevators #58 and #59. Elevator #59 will be taken out of service first, and it will be down for approximately 17 weeks. After #59 is complete, it will be returned to service, and #58 will be taken out of service to be modernized.
East Building roof replacement update
Workers began the replacement of the East Building’s roof on September 9th. The demolition phase has been completed. The roof replacement is scheduled for October 1st – November 4th, during the hours of 7am – 5 pm. There will be a series of crane picks throughout the project. All crane picks will occur from the […]
Sidewalk work to start September 18th – Kingshighway and Barnes-Jewish Plaza intersection
Sent on behalf of Barnes-Jewish Hospital. Upgrades to the sidewalks at Kingshighway and Barnes-Jewish Plaza intersection, as part of Campus Renewal, will start September 18 and continue in three phases for about five months. The intersection’s northwest corner is the first section to be affected (see the map). The sidewalk on the northwest corner will […]
Medical Campus street work notification – Children’s Place and Barnes-Hospital Plaza
Sent on behalf of Barnes-Jewish Hospital. Beginning the week of September 16, Sachs Electric (ArchKey) will be working on the Medical Campus to conduct fiber-pulling activities along Children’s Place and Barnes-Hospital Plaza (see the work location). Weather permitting, the planned duration of this work along Children’s Place is from Monday, September 16, through the close […]
Genome Data Center-Electric Service Interruption 10/13/2024
On Sunday, October 13th 7 am – 3 pm Facilities will be conducting cleaning of the switchgear on the “W” feeder, power will be transferred to the “D” feeder so there will be no interruption of utilities during the outage.
Genome Data Center-Electric Service Interruption 10/12/2024
On Saturday, October 10th 7 am -3 pm Facilities will be conducting cleaning of the switchgear for Data Center east and west on the “D” feeder. Utilities will be transferred to the “W” feeder so there will be no interruption of power during the outage.
Genome Data Center-Special Hazard System Service Interruption 10/10/2024
On October 10th 7 am – 3 pm, During this time Facilities will be testing the special hazard system at the Genome Data Center. There will be no audibles are strobes going during this test.