Clinical Sciences Research Building-Elevator Service Interruption 11/22-27/2023

The CSRB Service Elevator (Elevator #8) will have access to the 2nd floor locked out, starting Wednesday, November 22, at 4 pm. During this period, contractors will be painting the walls and epoxying the floor directly outside the elevator. Access to the 2nd floor will be restored on Monday, November 27, at 6 am.

Clinical Sciences Research Building, McDonnell Pediatric Research Building-Electric Service Interruption 12/10/2023

The purpose of this outage is to perform maintenance and testing on the 4160V switchgear that distributes power to the CSRB Chillers. This is the 2nd of two outages to do this work. Facilities electricians will perform switching to isolate and de-energize the ‘W’ Feed portion of the switchgear. When all work is complete the […]

Clayton Garage-Elevator Service Interruption 12/4/2023-4/5/2024

The Clayton Garage remodel project for the North bank of elevators (#60 & #61) will begin the morning of Monday December 4th, 2023. Elevator #61 will be taken out of service first and will be out of service for ~17 weeks while elevator #60 will remain running. Protection will be provided around each elevator while […]

Clinical Sciences Research Building, McDonnell Pediatric Research Building-Electric Service Interruption 12/4/2023 6-10 am

The purpose of this outage is to perform maintenance and testing on the 4160V switchgear that distributes power to the CSRB Chillers. This is the 1st of two outages to do this work. Facilities electricians will perform switching to isolate and de-energize the ‘D’ Feed portion of the switchgear. When all work is complete the […]

Specialized Interim Research Building, Specialized Research Facility East, Facilities Engineering Supply Room, Health Administration Planning-Electric Service Interruption 12/1/2023 7-11 pm

The purpose of this outage is to perform maintenance and testing on the main electrical switchgear that distributes power to SRF-East, as well as the outdoor Transformer that serves SIR. This is the 2nd of two outages to do this work. Facilities electricians will perform switching to single-line the SRF-East, main switchgear to the ‘D’ […]