To make repairs, no domestic hot water will be available to the building on June 10th 12 am-June 11th 4 pm. This will affect all restrooms, sinks, showers, and any system using domestic hot water. A follow-up notification will be issued when all repairs have been completed and the system is back to normal operation.
CSRB North Tower Addition-Steam Service Interruption 6/16-17/2023
On Friday, June 16th 4 pm – Saturday, June 17th 4 pm Facilities will be working on the steam system that feeds steam to the entire building. No steam will be available to all autoclaves. Hot water throughout the building will be cooler than normal during this time.
Lights Out Heartland Program
April and May are the peak spring migration months for birds! As participants in the Lights Out Heartland initiative, a program designed to curb light pollution during seasonal bird migration periods in April/May and September/October, WashU encourages you to turn off lights before leaving a space and close blinds in the evenings. Interior lights shining […]
ECSS shared spaces
As a reminder, all events or functions held in ECSS Shared Spaces must be approved by the ECSS Shared Spaces Reservation team. These spaces also include gathering areas such as the Food Truck Area, Shaffer Courtyard, and the Shell Café seating area. To view a list of ECSS Shared Spaces, please visit the MEET website. […]
Parking reminder for patient garages on the Washington University School of Medicine Campus
Sent on behalf of Barnes-Jewish Hospital. Barnes-Jewish Hospital and St. Louis Children’s Hospital are experiencing a large volume of faculty and staff from WUSM and BJC parking in the patient garages, including Parkview Garage, Laclede Garage, Plaza Garage, Euclid Garage and Children’s Hospital Visitor Garage. The activity involves paying the daily rates and various means […]
Mallinckrodt Institute Radiology-Elevator Service Interruption 6/4/2023
Elevator 102 will be out of service on Sunday, June 4, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption 6/18/2023
Elevator 103 will be out of service on Sunday, June 18, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 6/5-17/2023
A contractor will be cleaning a portion (the large vertical riser) of the supply air ductwork served by the laboratory supply air unit, AHU-2. This unit serves laboratories on the northeast and east side of the building (roughly half of the laboratory facilities in MPRB). To minimize the impact on the lab occupants, the contractor […]
CSRB North Tower Addition-Second Floor Men’s Restroom Service Interruption 6/1-2/2023
On Wednesday, June 1st 6 am- Friday, June 2nd 6 pm the 2nd floor Men’s Restroom (2046) will be closed for wall/ceiling repairs related to previous water damages.
Steven & Susan Lipstein BJC Institute of Health 6/5/2023
On Monday, June 5th 4-7 am Facilities will be working on the system that supplies lab air to labs located on floors 7 through 11 as well as the lower level vivarium. No lab air will be available during this time.