To improve the exhaust system and reduce the risk of unplanned failure, Facilities Technicians will replace a motor serving the BSL3 suite 8201. To complete this work there will be a series of outages needed. The outages will follow the schedule below. During the times noted there shall be NO work allowed in BSL3 suite […]
Steven & Susan Lipstein BJC Institute of Health-DI Water Service Interruption 6/17/2023
On Saturday, June 17th 7:00 am – 3:00 pm contractors will be working on the the RO system that feeds floors 7 through 11 and the lower level vivarium in support of the vertical expansion project. These areas of the building will not have RO water available to them during this time.
Steven & Susan Lipstein BJC Institute of Health-Air Handling Unit 6/28-29/2023
On June 28th 6 pm-June 29th 12:00 am contractors will be making repairs to the air handlers that feed floors 7 through 11. Floors 7 through 11 will not have any supply or exhaust air during these times. No work should be performed in any fume hoods during these times. Facilities will be monitoring temperatures […]
Couch Biomedical Research Building-Gas Service Interruption 6/7/2023
On June 6th from 7 am to 12 pm there with be a medical gas outage to the 2nd floor of the Couch Biomedical research building. This will only affect the west half of the second floor there be limited to no lab air, vacuum, gas, argon, and nitrogen in this time.
Euclid Power Plant drive/parking closed June 14th-August 1st
Workers will excavate the drive between the Farrell Learning & Teaching Center (FLTC) and the Euclid Power Plant between Wednesday, June 14th and Tuesday, August 1st (weather dependent). We will close all vehicular and pedestrian access to this area. Pedestrians must use the FLTC for access between Euclid and Scott Avenues. Please see the photos […]
4444 Forest Park SKIDATA parking gate control system installation on the west lot new completion date of June 23rd
The 4444 Forest Park west (patient/visitor) parking lot will have a new gate control system installed at the entrance to the parking lot. The parking gate control structure installation began on Monday, April 24th, with an estimated completion date of Friday, June 23rd, due to a delay in receiving the equipment. Traffic will be rerouted […]
Euclid Power Plant drive/parking closed today (May 31st)
Today (May 31st), from 7 am to 12 pm, workers will close the Euclid Power Plant drive/parking for a crane to replace a fan on a cooling tower. This will only affect the area between the red lines in the photo. Please use the FLTC to access Euclid or Scott Avenues. If you have any […]
Specialized Research Facility East-Steam Service Interruption 6/10/2023
On June 10th from 2 am to 2 pm there will be a steam outage for the Specialized Research Facility East to replace parts failing with the system and for upgrades. In this time frame there will no steam to the cage wash and hot water to cage wash equipment, autoclaves, and hot water to […]
Couch Biomedical Research Building-Chilled Water Service Interruption 6/1/2023
On Thursday June 1st from 6 am to 8 am there will be a chilled water outage to only the second floor of the Couch Biomedical Research Building to and new lines for a upcoming lab. In this time frame there will be limited to no cooling on the second floor only.
Specialized Research Facility East-Elevator Service Interruption 6/1/2023
Elevator #82 will be taken out of service for repairs on Thursday, June 1, from 8 am to 12 pm. Once repair is complete, it will be returned to service.