Lights Out Heartland Program

April and May are the peak spring migration months for birds! As participants in the Lights Out Heartland initiative, a program designed to curb light pollution during seasonal bird migration periods in April/May and September/October, WashU encourages you to turn off lights before leaving a space and close blinds in the evenings. Interior lights shining […]

ECSS shared spaces

As a reminder, all events or functions held in ECSS Shared Spaces must be approved by the ECSS Shared Spaces Reservation team. These spaces also include gathering areas such as the Food Truck Area, Shaffer Courtyard, and the Shell Café seating area. To view a list of ECSS Shared Spaces, please visit the MEET website. […]

Parking reminder for patient garages on the Washington University School of Medicine Campus

Sent on behalf of Barnes-Jewish Hospital. Barnes-Jewish Hospital and St. Louis Children’s Hospital are experiencing a large volume of faculty and staff from WUSM and BJC parking in the patient garages, including Parkview Garage, Laclede Garage, Plaza Garage, Euclid Garage and Children’s Hospital Visitor Garage. The activity involves paying the daily rates and various means […]

McDonnell Pediatric Research Building-Air Handling Unit Service Interruption 6/5-17/2023

A contractor will be cleaning a portion (the large vertical riser) of the supply air ductwork served by the laboratory supply air unit, AHU-2. This unit serves laboratories on the northeast and east side of the building (roughly half of the laboratory facilities in MPRB). To minimize the impact on the lab occupants, the contractor […]

Steven & Susan Lipstein BJC Institute of Health 6/5/2023

On Monday, June 5th 4-7 am Facilities will be working on the system that supplies lab air to labs located on floors 7 through 11 as well as the lower level vivarium. No lab air will be available during this time.

Renard Hospital-Hot Water System Service Interruption 5/24/2023

Facilities will be making necessary repairs to the heating hot water system that feeds the entire building. All air handler units will still be available during this time. Temperatures may vary throughout the building during the above-noted date and times.