Elevator 102 will be out of service on Sunday, April 2, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Category: Outages
CSRB North Tower Addition-Elevator Service Interruption 3/24/2023
CSRB-NTA, elevators #1 & #2 will be intermittently out of service from 8am to 12pm, for fire recall testing of both elevators. During this time the PED’s elevators or CSRB elevators can be used as an alternate route.
McDonnell Pediatric Research Building-Electric Service Interruption 3/26/2023
On Sunday, March 26th 7-11 am Facilities/Contractors will be changing the D side HVL Surge Arresters for the Pediatric Research Building. During the outage the fire pump will lose normal power and the emergency generator will start and be running. The building will be fed one sided from W and should cause no further power […]
McDonnell Pediatric Research Building-Exhaust Fan Service Interruption 3/22/2023
On Wednesday, March 22nd 4-7 am to perform preventative maintenance facilities technician will be shutting down the exhaust systems serving the ABSL3/BSL3 labs throughout the building. NO work shall take place in ABSL3/BSL3 suite 7301,7303,7230, and 8201.
CSRB North Tower Addition-Elevator Service Interruption 3/20/2023-7/17/2023
Elevator # 5 (Dirty Elevator) will be out of service for 16 weeks due to a complete remodel of the elevator.
McDonnell Pediatric Research Building-EDS Service Interruption for MPRB 7230 BSL3 suite and 8201C-BSL3 3/20/2023-3/29/2023
During March 20th 7 am – March 29th 7 am the effluent decontamination system (EDS) serving the MPRB 7230 BSL3 suite and 8201C-BSL3 lab will be out of service to accommodate the annual preventative maintenance and calibration of this system. Research work may continue in the 7230 BSL3 suite and 8201C-BSL3 lab during this outage.
Mallinckrodt Institute Radiology-Air Handling Unit Service Interruption 3/27/2023-4/2/2023
Contractors will be making multiple repairs to the air handler that feeds floors 1 through 7. These repairs will be performed March 27-April 2nd during the hours of 8:00 pm to 6 am each night. Floors 1-7 will experience loss of airflow and may see slightly warmer than normal temperatures during the evenings noted above.
McDonnell Pediatric Research Building-7301 BSL3 Suite 3/17/2023
On Friday, March 17th Custodial Services will be cleaning the floor in lab 7301. During this time NO work shall occur in the 7301 BSL3 suite.
Steven & Susan Lipstein BJC Institute of Health-Electric Service Interruption 3/18/2023
On Saturday, March 18th 7 am-3 pm contractors will be rewiring circuits to accommodate wall removal for cage wash renovations. The basement vivarium loading dock lighting along with the vivarium power door assist and a few receptacles will be interrupted at various times throughout the noted date and times.
McDonnell Pediatric Research Building-Roof Replacement 3/27/2023-7/17/2023 6 am-6 pm
Contractors will replace the entire McDonnell Pediatrics Research Building roof during the above-noted dates and times. This work will be performed at different times of the day depending on the weather. Occupants will experience noisier than normal conditions along with some vibration.