On Sunday, November 16, 7:00 a.m. – 2:00 p.m., facilities, along with contractors, will be conducting a test of the duct detectors in the air handling system. There shall be no alarms present during this test.
Category: Outages
Mallinckrodt Institute Radiology-Elevator Service Interruption 11/2/2025
Elevator 102 will be out of service on Sunday, November 2nd, from 8:00 a.m. to 12:00 p.m. for preventive maintenance. It will be back in service at noon.
Mallinckrodt Institute Radiology-Electric Service Interruption 11/15/2025
On Saturday, November 15, 7-11 a.m., facilities and contractors will conduct an electrical outage affecting lighting and receptacles on floors 5 through 12. Although power will be available for the other floors, the HVAC will be down during the outage.
Steven & Susan Lipstein BJC Institute of Health-Domestic Cold Water 11/8/2025
On Saturday, November 8, from 5:00 a.m. – 5:00 p.m., to facilitate repairs to the heating system, the domestic water will be shut down for piping modifications. During this time, the DCM cage wash facility will be without domestic cold water.
McDonnell Medical Sciences Building-Air Handling Unit Service Interruption 10/23/2025
On Thursday, October 23, from 6 to 10 p.m., Air Handler 9 will be shut down to assist the contractor with rebalancing the fan. Office areas on the 9th floor will be affected with no cooling, heating, or airflow during this time. Lab spaces will continue to function as usual. Thank you for your patience […]
Biotechnology Center-Exhaust Fan Service Interruption 11/22-23/2025
From Saturday, November 22, 7:00 a.m. to Sunday, November 23, 8:00 a.m., all exhaust systems for the building will be shut down to assist the contractor. This outage will affect all fume hoods and building exhaust systems. During this outage, there should be no work conducted in the fume hoods. Thank you for your cooperation […]
McDonnell Medical Sciences Building-Air Handling Unit Service Interruption 10/21-22/2025
From Tuesday, October 21, at 6:00 p.m. to Wednesday, October 22, at 1:00 a.m., Air Handler 9 will be shut down for necessary repairs. There will be no cooling, heating, or air flow in the office areas on the 9th floor. Lab spaces will not be affected. Thank you for your patience.
CSRB North Tower Addition-433/444 Lab Door Service Interruption 10/30/2025
On Thursday, October 30th, 9:00 a.m. – 12:00 p.m., facilities door technicians will be making improvements to the 433/444 lab. During this time, NO work shall take place in the lab.
West Building-Air Handling Unit Service Interruption 10/21/2025
At approximately 5:50 a.m. there was a mechanical failure with an Air Handler Unit that serves the 5th floor. At this time Facilities Engineering is in the process of recovering the Air Handler Unit. A follow-up message will be delivered once all mechanical systems and room pressures are working in a normal manner.
REVISE UPDATE-Steven & Susan Lipstein BJC Institute of Health-Elevator Service Interruption 10/17-27/2025
The service elevators 113 & 114 are operating in emergency dispatching mode until further notice. This means the Hall Call buttons will not work, the elevators run up and down continuously, and stop at random floors. There will likely be longer wait times for these elevators. However, the buttons inside the elevator car should work […]