East Building-Domestic Hot Water Service Interruption 5/14-24/2024

On Tuesday, May 14th at 8 am we had a failure to the domestic hot water system for the East building. The system will be down until Friday, May 24th 3:30 pm, until we can receive the parts to repair. This affects all floors domestic hot water to lab sinks, restrooms, and anything else using […]

CSRB North Tower Addition-Fire Alarm Service Interruption 5/16-17/2024

In support of the fire alarm upgrade project for NTA, the fire alarm contractor will be installing fire alarm control modules on the supply and exhaust air handling units that serve the 4th and 5th floors of NTA. The work will occur during two successive early morning outages. NO work may occur in the 4th […]

CSRB North Tower Addition-Elevator Service Interruption

As part of the new fire alarm system install, facilities will be testing the fire recall on all elevators starting at 7 am on Tuesday, May 14th 7 am. Elevators will be taken out of service one at a time as needed to complete the testing. If necessary, testing will be continued on Wednesday, May […]

Clayton Garage-Elevator Service Interruption 5/16-17/2024

Clayton Garage elevators #60 & #61 located on the North side of the garage will be out of service on Thursday, May 16th starting at 6:00,am and reopening on Friday, May 17th at 5:00 pm for relocating the elevator construction barriers from elevator #61 to the adjacent elevator #60. The elevator call buttons will also […]

West Building-Air Handling Unit Service Interruption 5/11/2024

Contractors will be working on the air handler that serves Lab 1754. The lab will have no airflow and may be warmer than normal on Saturday, May 11th 6 am – 2 pm. Facilities will install a spot cooler to assist with desired temperatures

Barnard Hospital, Bernard Becker Medical Library, Biotechnology Center, Steven & Susan Lipstein BJC Institute of Health, Cancer Research Building, Clinical Sciences Research Building, Euclid Power Plant, Farrell Learning & Teaching Center, Irene W Johnson Institute Rehab, Mallinckrodt Institute Radiology, Maternity Hospital, McDonnell Medical Sciences Building, McMillan Hospital, North Medical Building, Olin Residence Hall, Renard Hospital, South Medical Building, West Building, Wohl Clinic, Wohl Hospital-Domestic Hot Water Service Interruption 5/17-19/2024

Facilities Engineer will be conducting a domestic hot water outage for the buildings listed above from May 17th 5 pm – May 19th 7 pm. This will affect all restrooms, sinks, showers, and any system using domestic hot water. We anticipate the outage to be completed before the end date/time listed and will issue a […]

Eric P Newman Education Center, North Medical Building, Bernard Becker Medical Library, Olin Residence Hall, Cancer Research Building-Steam Service Interruption 5/17-19/2024

Facilities Engineering will be conducting a steam outage for the building on May 17th 5 pm – May 19th 7 pm. This outage will affect building heating, glass washers, sterilizers, autoclaves, humidifiers, and any system requiring steam to operate on all floors. Space temperatures will be monitored remotely and adjusted accordingly to try and maintain […]