From 6/2-12, the 7230 A/BSL3 suite will be unavailable for research to accommodate a decontamination and subsequent maintenance and recommissioning of the suite. NO work may occur in the 7230 A/BSL3 suite during this outage.
Category: Outages
6/20: Planned Service Interruption – Gary C. Werths Building at Siteman Cancer Center, Electric
On 6/20, from 12 pm to 4 pm, facilities will be conducting a load bank test of the generator at Gary C. Werths at Siteman Cancer Center. During the test, there will be no power loss, no power blips, and no power sags. The generator will run for 4 hours to complete the test.
6/20: Planned Service Interruption: South Building, Exhaust Fan
On 6/20, from 6 am to 3 pm, Exhaust Fan 8C will be shut down to facilitate the replacement of the variable frequency drive (VFD). During this outage, the following fume hoods will not have airflow and should not be used. Fume hoods, 1902,1905, 1906, 1911B, and 1914 on the first (1st) floor. Fume hoods […]
6/18-19: Planned Service Interruption – BJC Institute of Health, Air Handling Unit, Exhaust Fan
During the dates and times noted below, facilities technicians will be performing preventative maintenance on the HVAC systems serving the 11th-floor ABL suite and the B120 suite located in the basement. During these maintenance periods, no work shall be conducted in either lab suite. Thursday, June 18th – 5:00 AM to 7:00 AMFriday, June 19th […]
6/13: Limited Service Interruption – South Building, Air Handling Unit
On 6/13, from 6 am to 3 pm, Air Handling Unit #3 serving the 3rd, 4th, and 5th floors will be shut down to replace the supply air variable frequency drive (VFD). During this outage, there will be no airflow, heating, or cooling capabilities. Thank you for your patience.
6/1: Planned Service Interruption – Fort Labs, Electric
On 6/1, from 3 am to 5 am, facilities and contractors will be conducting repairs to the transformer (RBAMTO1) that supplies emergency power to LL. All emergency power on the West end of the floor will be affected for the duration of the outage. Lighting in this facility WILL NOT be affected.
6/2: Planned Service Interruption – Fort Labs, Electric
On 6/2, from 3 am to 5 am, facilities and contractors will be conducting an electrical outage to repair transformers that supply emergency power to the LL east side of the building. Receptacles, controls, and some equipment that are supplied with 120V/208V emergency power will be affected. Lighting WILL NOT be affected.
6/3: Planned Service Interruption – Fort Labs, Electric
On 6/3, from 6 am to 8 am, facilities, along with contractors, will be conducting an electrical outage to repair emergency transformers on the second floor. The affected areas will be the freezer farm, the BIOS system, and the air dryer. Lighting WILL NOT be affected.
6/4: Planned Service Interruption – Fort Labs, Electric
On 6/4, from 6 am to 8 am, facilities and contractors will conduct an electrical outage to repair the transformer that supplies normal power to the lab and LER on the 11th floor. All normal power receptacles will be affected by this outage. Lighting will not be affected during the outage.
5/21: Planned Service Interruption – Fort Labs, Fire Alarm
On 5/21, from 5 am to 7 am, facilities will be conducting a fire alarm test to verify that updates are working properly. During the test audibles will be heard and strobes will be witnessed. there will be no need for evacuation. THIS IS ONLY A TEST.