On Friday, March 8th 4:30-6:00 am Facilities Electricians will be working with contractors to install meters in the 5KV switchgear cabinet doors, this will be the 1st of 2 outages. Feeds will be one-lined to the “D” feed to isolate the “W” 5KV switch for work to be done. After work is completed switching will […]
News
Mallinckrodt Institute Radiology-Elevator Service Interruption 4/21/2024
Elevator 103 will be out of service on Sunday, April 21st, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption 4/7/2024
Elevator 102 will be out of service on Sunday, April 7th, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.
McDonnell Pediatric Research Building-BSL3 Suite 8201 Service Interruption 3/8/2024
On Friday, March 8th 10 am – 12 pm facilities door technicians will be performing programming changes to the locks inside of BSL3 suite 8201. During this time NO work shall take place in the lab.
McDonnell Pediatric Research Building-BSL3 Suite 7301 Service Interruption 3/8/2024
On March 8th 9-10 am facilities technician will be performing work on the locks inside of BSL3 suite7301. During this time NO work shall be conducted in the suite.
CSRB North Tower Addition-BSL3 Suite 426/443 Service Interruption 3/7/2024
On Thursday, March 7th 6 am – 2 pm DCM will be performing a decontamination of BSL3 suite 426/443. During this time NO work shall take place within the BSL3 suite.
REVISED-Mallinckrodt Institute Radiology-Elevator Service Interruption 3/1-22/2024
Due to needed repairs, elevator #103 will be out of service starting at 3pm, on March 1st. A main control board had to be sent to manufacturer to be repaired. Repaired board is in route and expected to be installed in next day or two. The elevator will be returned to service as soon as […]
Mallinckrodt Institute Radiology-Elevator Service Interruption 3/17/2024
Elevator 102 will be out of service on Sunday, March 17th, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.
A new pedestrian bridge in the making
Sent on behalf of Barnes-Jewish Hospital. The pedestrian bridge connecting Barnes-Jewish Hospital’s Plaza Garage to the main lobby will open this summer, and the progress is remarkable. Learn why the new bridge is important in the scope of Campus Renewal from Roma Bordewick, BJH patient support services director, as well as the project manager and […]
4533 Clayton tuckpointing project started March 1st
On Friday, March 1st, contractors started the 4533 Clayton tuckpointing project. The work hours will be 6 pm-5 am, with a substantial completion date of May 1st. The contractors will utilize a swing stage, and parking will not be affected now. There may be a time when a lift will be required, and we will […]