In order to replace bulbs ABSL3 suite B120 will be out of service on April 18th 6-7 am. During this time NO work shall take place inside the suite.
News
McMillan Hospital-Air Handling Unit Service Interruption 4/15/2023
On April 15th from 6am to 6pm Air handling unit 11 will be down for repairs in McMillan Hospital. In these scheduled times there will be limited to no air flow and heating/cooling to floors 1, 3, 4, and 5 of McMillan.
McDonnell Pediatric Research Building BSL3 Lab 7302 Entry Door Service Interruption 4/14/2023
On Friday, April 14th 12 – 3 pm the entry door to BSL3 lab 7302 the lab will be put out of service for repairs . During that time NO work shall be allowed in the lab.
McDonnell Pediatric Research Building-Exhaust Fans Service Interruption 4/10-11/2023
Between April 10th 9 pm – April 11th 7 am testing will be completed on one of the 8201 BSL3 suite exhaust fans. Little to no impact is expected to 8201 suite pressures, air flows, and temperatures. No work may occur in the 8201 BSL3 suite during this outage.
Clinical Sciences Research Building-Southwest Entrance Vestibule Service Interruption 4/18/2023
On Tuesday, April 18th 4 pm – 8 pm the southwest entrance vestibule to the Clinical Science Research Building will be closed. Alternate access can be gained through the McDonnell Pediatric Research Building. This closure is needed in order to make necessary repairs to the heating system for this vestibule.
Couch Biomedical Research Building-Electric Service Interruption 5/7/2023
This will be the first of two outages. On Sunday, May 7th 7 – 11 am. The purpose of this outage is to perform maintenance and testing on the main electrical switchgear that distributes power throughout the 4515 Couch Building. This requires de-energizing half of the main electrical switchgear, fed from the ‘D’ utility, so […]
Mallinckrodt Institute Radiology-Air Handling Unit Service Interruption 4/16-4/17/2023
Contractors will be working on the air handler that feeds floors 1 through 7 in preparation for cleaning the entire air handler. This air handler will be off at various times throughout April 16th 8 am -17th 6 am. Floors 1 through 7 may experience loss of airflow and slightly warmer than normal temperatures during […]
Southwest Tower-Air Handling Unit Service Interruption 4/22/2023
Facilities will be working on air handler units that serve floors six, seven, and eight. These floors may experience loss of airflow and slightly warmer than normal temperatures on Saturday, April 22nd 6 am – 10 am. No fume hoods will be affected by this outage.
Mallinckrodt Institute Radiology-Air Handling Unit 4/17-20/2023
Contractors will be making multiple repairs to the air handler that feeds floors 1 through 7. These repairs will be performed during the hours of 8:00 pm to 6:00 am each night. Floors 1-7 will experience loss of airflow and may see slightly warmer than normal temperatures during the evenings noted above.
Mallinckrodt Institute Radiology-Air Handling Unit April 10-11, 2023
Contractors will be working on the air handler that feeds floors 1 through 7. This work will be performed between the hours of 8:00 pm on April 10 6:00 AM through April 11 6 am. Floors 1 – 7 will experience loss of airflow and may see slightly warmer than normal temperatures during the dates […]