Facilities will be turning off air handler units feeding the 10th floor during February 6th – February 10th. The units will be off periodically from 5:00 pm to 4:00 am each night, Monday, Tuesday, Wednesday, and Thursday. During these times the 10th floor may notice a decrease in airflow and slightly warmer than normal temperatures.
News
Mallinckrodt Institute Radiology-Air Handling Unit Services Interruption 1/27/2023 8:10 am – 4:30 pm
There has been a mechanical failure with an Air Handler Unit that support multiple floors in the building. At this time Facilities Engineering is in the process of recovering this unit. A follow-up notification will be sent to inform building occupants on the status of repairs for the unit. We apologize for any inconvenience that […]
McDonnell Pediatric Research Building-Suite BSL3 Services Interruption 1/26/2023-1/31/2023
On Thursday, January 26th 7:00 am – Tuesday, January 31st 9:00 am the 8201 BSL3 suite will be decontaminated to facilitate moving equipment out of the 8201 suite.
Renard Hospital-Fire Pump Service Interruption 2/7/2023
Contractors will be replacing the Automatic Transfer Switch for the Fire Pump in Renard. During the above time no Hot Work will be permitted.
McDonnell Pediatric Research Building-7301 Suite Lab Service Interruption 1/20/2023
To troubleshoot an issue with a door in the 7301 suite the lab will be shutdown on Friday, January 20th 1 pm – 2 pm. During this time NO work shall take place in the BSL3 suite.
Mallinckrodt Institute Radiology-Elevator Service Interruption 2/19/2023
Elevator 103 will be out of service on Sunday, February 19, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Mallinckrodt Institute Radiology-Elevator Service Interruption 2/5/2023
Elevator 102 will be out of service on Sunday, February 5, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.
McMillan Hospital, Wohl Hospital-Elevator Service Interruption 2/21/2023-2/22/2023
Elevators in the listed buildings will be out of service to be tested on emergency generator power, from 6am to 7am, on Tuesday, February 21, and Wednesday, February 22. During this time lighting and equipment connected to the emergency power system may experience a blip when power is transferred. The list that follows shows which […]
McMillan Hospital, Wohl Hospital-Elevator Service Interruption 2/20/2023
Elevators in the listed buildings will be out of service for 2 to 3 hours on February 20, any time between 3:30 PM and 7:30 PM, to conduct 5-year inspections and fire service recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on […]
Wohl Clinic, Grant Medical Building, Irene W Johnson Institute Rehab, McMillan Hospital, Eric P Newman Education Center, 4480 Clayton, Wohl Hospital-Elevator Service Interruption 2/23/2023-2/24/2023
Elevators in the listed buildings will be out of service for about 2 to 4 hours, between 7:00 AM and 3:30 PM, on February 20 through February 24. This is to conduct annual inspections and fire recall tests as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will […]