Fixture Contracting will use a lift to install the horizontal lifeline system on the walkway between EPNEC and FLTC. This work is scheduled for October 20 to October 31 and is weather-dependent. The work will be performed in 3 phases. Workers will start on the EPNEC side, with the lift set on the walk path […]
News
October 20-21: BJC Institute of Health (BJCIH) Walkway Horizontal Lifeline Installation
From October 20 to October 21, Fixture Contracting will use a lift to install and inspect the horizontal lifeline cable on the BJCIH/FLTC walkway roof. The installation will take one day to complete. The work will be inspected and certified on October 21. Barriers, caution tape, and warning cones will be placed to block the […]
CSRB North Tower Addition-433/444 Lab Door Service Interruption 10/30/2025
On Thursday, October 30th, 9:00 a.m. – 12:00 p.m., facilities door technicians will be making improvements to the 433/444 lab. During this time, NO work shall take place in the lab.
West Building-Air Handling Unit Service Interruption 10/21/2025
At approximately 5:50 a.m. there was a mechanical failure with an Air Handler Unit that serves the 5th floor. At this time Facilities Engineering is in the process of recovering the Air Handler Unit. A follow-up message will be delivered once all mechanical systems and room pressures are working in a normal manner.
REVISE UPDATE-Steven & Susan Lipstein BJC Institute of Health-Elevator Service Interruption 10/17-27/2025
The service elevators 113 & 114 are operating in emergency dispatching mode until further notice. This means the Hall Call buttons will not work, the elevators run up and down continuously, and stop at random floors. There will likely be longer wait times for these elevators. However, the buttons inside the elevator car should work […]
CANCELED-McDonnell Medical Sciences Building-Air Handling Unit Service Interruption 10/20/2025
On Monday, October 20, from 8:00 a.m. to 2:00 p.m., Air Handler 09 will be shut down to assist the contractor in the repair and rebalancing of Air Handler 9, which serves the offices on the 9th floor. During this time, there will be no cooling within the office areas. Lab spaces will continue to […]
Barnard Hospital-Air Handling Unit Service Interruption 10/22-24/2025
On Wednesday, October 22, from 7:00 a.m. to Friday, October 24, at4:00 p.m., the Air Handler Unit will be shut off as the controls are upgraded. The purpose of this outage is to replace the legacy temperature control system that supports the basement Cyclotron Air Handler Unit. During this outage,
Couch Biomedical Research Building-Chilled Water Service Interruption 10/24-27/2025
Just to let you know, the Facilities department will be shutting down all chilled water supply to the facility to help contractors replace a chilled water control valve. Between October 24, 6:00 p.m., and October 27, 6:00 a.m., chilled water will be unavailable for the building’s cooling systems, microscopes, and any other equipment that requires […]
Mallinckrodt Institute of Radiology-Elevator Service Interruption 10/31/2025
The Elevators will be tested on the emergency generator power between 5:00 a.m. and 6:00 a.m. The elevators will be returned to regular operation as soon as the test is complete.
McDonnell Pediatric Research Building-Air Handling Unit 11/8/2025 6 am-8 pm
Facilities will turn off the air handler for equipment upgrades. The areas affected by this outage will be the administrative offices serving the south section of the building for floors 3 through 11, second floor pedestrian link, and main lobby. During the noted outage times, the airflow to these affected areas will experience minimal to […]