Locker/Shower Room Reminder for Those Impacted by Recent Storms

As the St. Louis area continues to recover from the recent storms, we want to remind all WashU Medicine employees and students, especially those who may have been directly impacted, that locker and shower facilities on campus remain available for your use. These amenities can be helpful if you are experiencing disruptions at home. If […]

WashU Medicine Campus Store – St. Louis Area, American Red Cross Donations

The WashU Medicine Campus Store (MCC, 1st floor) will be accepting donations to the St. Louis Area American Red Cross. Students, faculty, staff and visitors are welcome to stop by and make a donation at the point-of-sale system, with or without a campus store purchase. Bear Bucks are accepted as a form of payment for […]

Southwest Tower-Domestic Cold Water Service Interruption 5/26/2025

On Monday, May 26th, from 3 to 9 am, BJH Facilities will shut down the domestic water supply to the building to repair the backflow system. Both potable and non-potable water will be unavailable during this time. Labs and occupants may experience little to no water flow in restrooms, showers, kitchen break rooms, glass washrooms, […]

May 20-August: Barnard Exhaust Fan Replacement

Bernhard Engineering/ENFRA will begin investigating the entire Barnard exhaust fan #3 system throughout the building. This will consist of an ENFRA/Bernhard Engineer walking around the whole building and following the ductwork through the ceilings to create an as-built of the system. They will remove ceiling tiles and look above the ceilings as needed throughout the […]

May 20-June 9: BJCIH Utility Vault Roof Drain Routing on Euclid Avenue

Starting at 5 am on May 20th, Tarlton will begin work to route the new roof drain lines from the BJCIH utility vault to the city sewer system. This project includes saw cutting and removing a section of sidewalk and roadway along Euclid Avenue near the Central West End MetroLink. The saw cutting will occur […]