Elevator #103 is out of service for repairs until further notice. It will be returned to service once the repairs are complete.
News
Revised-Couch Biomedical Research Building, Bernard Becker Medical Library, North Medical Building-Electric Service Interruption 4/29-30/2025
Elevators in the listed buildings will be out of service for testing on emergency generator power from 6 am to 7 am each day, starting on April 29 and continuing through April 30. During this time, lighting and equipment connected to the emergency power system may experience a brief disruption when the power is transferred. […]
Mid Campus Center-Heating Hot Water Service Interruption 4/28/2025
On Monday, April 28th, from 6 to 11 a.m., heating and hot water will be shut off and drained on the 9th floor of MCC for maintenance. Customers may experience cooler temperatures than normal.
East McDonnell Facility-Air Handling Unit Service Interruption 4/27-29/2025
At approximately 12:45 pm, the East McDonald Air Handler Air 4 motor failed. To maintain cooling on the Sixth Floor, East McDonald Air Handler 5 will temporarily supplement airflow while repairs are made and a replacement motor is installed on Air Handler 4. Thank you for your patience and understanding. This matter is being actively […]
April 28-May 2: Newstead Entrance to Newstead Garage Temporary Interruptions
Due to scheduled construction work, there will be temporary interruptions to the Newstead (west side) entrance and exit of the Newstead Garage from April 28 to May 2. Details of the impact are as follows:• Monday, April 28: One lane will be closed at both the entrance and exit. Please use extra caution and allow […]
April 26: Window replacement along Taylor
Sent on behalf of the University of Health Sciences and Pharmacy (UHSP). Workers will replace a window on the UHSP campus in the Academic and Research Building at the corner of Taylor Avenue and Nash Way from 8 am to 1 pm on April 26. There will be signage for the traffic and pedestrian detours […]
April 25: Wohl Circle Closure Starts
Wohl Circle will be closed to vehicle traffic beginning April 25 at 3 pm to start preliminary work for the upcoming Wohl and Renard Bridge replacement projects. The circle will remain closed to vehicles throughout the bridge replacement, with an anticipated re-opening date in 2028.Removable bollards will be placed at the entrance and exit of […]
April 22: Busch Drive Patching
Workers will patch Busch Drive between Taylor and Newstead Avenues on April 22. One lane of Busch Drive will remain open at all times. Access to the Busch Lot will not be affected. If you have any questions, please contact Vern Watts, Director, Projects.
Mallinckrodt Institute Radiology-Elevator Service Interruption 4/27/2025
Elevator 103 will be out of service on Sunday, April 27th, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
Farrell Learning & Teaching Center-Air Handling Unit Service Interruption 4/26/2025
On Saturday, April 26th, Air Handlers 1 and 2 will be shut down for service and cleaning. During this time, floors 1 through 5 will not have heating, cooling, or air flow.