Wohl Clinic, Clayton Garage, Metro Garage-Elevator Service Interruption 6/24-26/2025

Elevators in the listed buildings will be out of service for testing on emergency generator power between 5:00 am and 7 am. During this time, lighting and equipment connected to the emergency power system may experience a brief disruption when the power is transferred. The following list indicates which buildings’ elevators will be tested:

June 2-13: Revised – East McDonnell East Facade Cleaning

From June 2 to June 13, workers will clean the bottom limestone band of the east facade of the East McDonnell Building. Because workers will use a lift to complete this work, sections of the parking lot will be closed in phases. Here is the phasing schedule, and the dates of the phases are listed […]

Neuroscience Research Building-Compressed Air 6/5/2025

On Thursday, June 5, from 3-6 am, contractors will install upgrades to the lab air system. This will affect all air tables, cage wash machines, turrets at lab benches, autoclaves, fume hood lab air turrets, and anything coming off of lab air with a regulator.

East McDonnell Facility-Electric Service Interruption 6/7/2025

On Saturday, June 7th, 7-11 am, facilities will conduct an electrical outage for maintenance. The affected areas will be normal-powered receptacles and lighting from floors 4 through the penthouse. The generator will run, providing power to the emergency receptacles and lighting. The elevator will be operational.