All Auxiliary locations will be closed during University-observed holidays, December 24th – 25th and December 31st – January 1st. The following locations will have modified holiday hours/closures:• NRB Kaldi’s Café – Closed December 23rd – January 1st• FLTC Kaldi’s Café – Closed December 23rd – January 1st• Shell Café – Closed December 23rd – December […]
4560 Clayton Avenue Building emergency roof repair starts December 23rd
Starting Monday, December 23rd, there will be an emergency roof repair project at 4560 Clayton. On Monday, contractors will shut down the turnaround north of 4560 Clayton, use the drive for the equipment (boom lift, telehandler, trucks, crates, etc.) and start removing and creating the clay tile. The crated tile will be staged on the […]
Northwest Tower, Mid Campus Center, Metro Garage-Fire Alarm Service Interruption 1/10/2025
On Friday, January 10th, from 4-7 am facilities will conduct an audible and strobe test of the fire alarm system. THIS IS ONLY A TEST.
Clinical Sciences Research Building, CSRB North Tower Addition, McDonnell Pediatric Research Building-Fire Alarm Service Interruption 1/9/2025
On Thursday, January 9, from 4 to 7 am, facilities will conduct an audible and strobe fire alarm system test. THIS IS ONLY A TEST.
West Building, Irene W Johnson Institute Rehab, Eric P Newman Education Center-Fire Alarm Service Interruption 1/8/2025
On Wednesday, January 8, from 4-7 am, facilities will conduct an audible and strobe test of the fire alarm system. THIS IS ONLY A TEST.
Renard Hospital, Maternity Hospital, McMillan Hospital-Fire Alarm Service Interruption 1/7/2025
On Tuesday, January 7, from 4-7 am, facilities will conduct an audible/ strobes test of the fire alarm system. THIS IS ONLY A TEST
Wohl Clinic, Wohl Hospital, Barnard Hospital-Fire Alarm Service Interruption 1/6/2024
On Monday, January 6th, from 4 to 7 am, facilities will conduct an audible/strobe fire alarm system test. THIS IS ONLY A TEST.
REVISED-CSRB North Tower Addition-Air Handling Unit Service Interruption 1/13/2025
On Friday, December 27th, from 5 to 6:30 am, Facilities Technicians will be conducting tests and making repairs to the air handling system serving the 4th floor. During this time, NO work shall take place in any 4th-floor BSL3 labs.
McMillan Hospital-Elevator Service Interruption 12/22-27/2024
Due to the flooding in the lower level of McMillan, elevators #28, and #29 will be out of service until further notice. Please use elevator #30 on the south side of the building during this time.
CSRB North Tower Addition-Domestic Hot Water Service Interruption 1/11/2025
On Saturday, January 11th, from 6 am to 2 pm, facilities will shut down the system to repair the building’s Hot Water System. During this time, showers, labs, cagewash areas, breakrooms, and restrooms will have No Hot Water during the above-noted times.