Elevators in the listed buildings will be out of service for 2 to 3 hours from 3:00 pm to 7:30 pm on February 17th to complete the 5-year fire recall testing as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on a priority basis depending […]
Author: Michelle
Steven & Susan Lipstein BJC Institute of Health, Renard Hospital-Elevator Service Interruption 2/17-19/2025
Elevators in these buildings will be out of service for 2 to 4 hours between 7:00 AM and 3:30 PM, starting February 17th, through February 19th. This is to conduct 5-year inspections as required by the Elevator Safety Unit of the Missouri Department of Public Safety. The elevators will be selected on a priority basis […]
Mallinckrodt Institute Radiology-Elevator Service Interruption 2/16/2025
Elevator 103 will be out of service on Sunday, February 16th, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back in service at noon.
East McDonnell Facility-Elevator Service Interruption 2/3-5/2025
Each day starting Monday, February 3rd, at 7 am through Wednesday, February 5th, at 3:30 pm as part of the fire alarm system upgrades, an elevator will be removed from service briefly to allow contractors to install new fire alarm devices. While one elevator is down the other elevators will be available to use.
East Imaging Center-Generator Service Interruption 1/28-2/11/2025
At approximately 2:45 pm on Tuesday, January 28, 2025, there was a mechanical failure with the East Imagine Back up generator. At this time Facilities Engineering is in the process of recovering the back up generator for the East Imagining Building. A follow- up message will be sent upon completion of repairs.
North Medical Building-Cold Room 2805 Service Interruption 1/28-2/7/2025
Between Tuesday, January 28th 10:45 am – Friday, February 7th 5 pm, Cold Room 2805 will be out of service for repairs. Cold Room is located on the second floor of the North building. We thank you for your patience and understanding during this time.
Wohl Clinic-Entrance Service Interruption 2/8/2025
On Sunday, February 2nd, from 6 am to 4 pm, contractors will close off the Wohl Clinic entrance to replace a curtain heater.
Barnard Hospital-Steam Service Interruption 2/7-8/2025 6 pm- 4 am
In order to repair a sewer line to the first-floor bathrooms, facilities will be shutting down the steam to the building this will affect all heating devices, and facilities will be adjusting airflows to help maintain the temperatures in the building.
McDonnell Pediatric Research Building-BSL3 Lab 8201C Service Interruption 1/31-2/4/2025
In order for plumbing repairs to be made in BSL3 lab 8201C a series of outages for the 8201 BSL3 suite will be required. During the dates and times noted below NO work shall take place in BSL3 suite 8201. 1/31 7:00 AM – 1:00 PM2/3 7:00 AM – 10:00 AM2/4 7:00 AM – 10:00 […]
McDonnell Medical Sciences Building-Domestic Cold Water Service Interruption 2/1/2025
On Saturday, February 1st, from 12 am – 12:12 pm, This outage will affect all potable water hot & cold to the building, All restrooms, sinks, autoclaves, glass washers, R.O& D.I water, vacuum, emergency eyewash & showers, cage washers, & ice makers. The reason for this outage is to replace the backflow prevention devices on […]