4/7: Planned Service Interruption – McDonnell Medical Science Building, Air Handling Unit
On 4/7 from 5 am to 7 am, Air Handler 9 serving the 9th floor will be shut down to facilitate the reinforcement of the supply fan wall. There will be no airflow, heating, or cooling capabilities from the air handling unit during the outage. All fan coil units on the floor will continue to […]
4/4: Limited Service Interruption – Cancer Research Building, Air Handling Unit
On 4/4 from 6 am to 6 pm, Air Handler 1 serving the 4th, 5th, and 6th floors will be shut down for cleaning. There will be no airflow, heating, or cooling capabilities to the floors during the outage. Thank you for your patience.
4/1: Limited Service Interruption – CSRB – North Tower Addition, Other
A communication issue with building automation system serving the 4th floor of NTA needs to be troubleshot and resolved. NO work may occur in the 4th floor biohazard area during this outage. UPDATE: As of 6:00 AM, WashU IT resolved the communication issue. All building systems are reporting normally to the control room. Work may […]
3/23-Oct ’26: WashU Medicine Campus GIS Survey Begins
Starting March 23, Facilities Engineering (FE) will begin collecting data for a GIS Map. This will help FE create an accurate map, inventory, and data collection to improve efficiency, safety, and planning. The project will run through October of 2026. If you have any questions, please contact Antwoine Feaman, Project/Program Manager, at afeaman@wustl.edu.
3/30-5/26: Ellen S. Clark Hope Plaza Restoration – Phase 3B Sidewalk Closure, Pending Weather
As part of the Ellen S. Clark Hope Plaza Restoration, the construction team will move the construction barriers to begin work on the Phase 3B portion of the plaza. The Phase 3B Sidewalk Closure is planned to begin at 6 a.m. on March 30 and continue through 6 a.m. on May 26. Once closed, […]