3/23: Farrell Learning & Teaching Center (FLTC) Entrance Off Euclid Avenue Temporary Closure
The west sliding door entry (off Euclid) to the FLTC first-floor lobby will close at 5 p.m. on March 23 for repairs to the damaged floor tile at the sliding door. Please use the Becker Library entrance as an alternative entry during this time. If you have any questions, please contact Kevin Kikas, Project Coordinator, […]
3/21: Wohl Clinic, Limited Service Interruption – Steam
Facilities will shut down steam to the building for repairs to the heating system. On 3/21 from 5 am to 3 pm, technicians will monitor any temperature-critical areas and make adjustments as needed.
3/21-22: West Pavilion, Limited Service Interruption – Air Handling Unit
Facilities will shut down the air handler serving floors 9 and 10 to assist contractors with repairs to the unit. This will occur during the noted times, from 6 a.m. to 6 p.m., on Saturday and Sunday. Facilities will monitor the affected floor areas and provide supplemental cooling as needed.
4/21-23: North Building, Planned Service Interruption – Fire Alarm System
On 4/21-23, from 7 am to 3 pm, facilities will coordinating the replacement of the North building fire pump. The outage is expected to last only until early April 23rd. During the absence of the fire pump, the sprinkler system will remain active in the event of an emergency. The outage will also affect FLTC, […]
3/25: Fort Labs, Planned Service Interruption – Electric
On 3/25, from 6 am to 8 am, contractors and facilities will be making changes to an electrical panel on the 2nd fl. that supplies power to Lab air, Air tables, and Cage washing equipment.