On September 30th 9 pm – October 1st 6 am Facilities will turn off the steam system that serves floors 6,7, and 8. No steam will be available to autoclaves and the HVAC system during this time. Floors 6,7, and 8 will experience colder-than-normal temperatures during this outage.
Southwest Tower-Domestic Hot Water Service Interruption 9/30-10/1/2023
On September 30th 9 pm – October 1st 6 am Facilities will turn off the domestic hot water that serves floors 6,7, and 8. No domestic hot water will be available to restrooms, labs, and eyewash stations during this time.
Southwest Tower-Domestic Cold Water Service Interruption 9/30-10/2023
Facilities will turn off the domestic cold water that serves floors 6,7, and 8. No domestic cold water will be available to restrooms, labs, eyewash stations, sterilizers, and the vacuum system on September 30th 9 pm- October 1st 1 am.
McMillan Hospital, West Building, East Building, East Imaging Center, Farrell Learning & Teaching Center, Neuroscience Research Building, Biotechnology Center-Steam Service Interruption 9/23-9/24/2023
To complete emergency repairs on September 23rd 3 am – September 24th 5 pm Facilities Engineering will be conducting a steam outage for the building during the above noted times. This outage will affect building heating, glass washers, sterilizers, autoclaves, humidifiers, and any system requiring steam to operate on all floors. Space temperatures will be […]
Mid Campus Center-Electric Service Interruption 10/15/2023 7am-11am
The purpose of this outage is to perform maintenance and testing on the main electrical switchgear that distributes power throughout the MCC Building. This first outage will be on the ‘D’ feed on both US-HNBW & US-HNBE. Facilities electricians will perform switching and de-energize the necessary switchgear so they can safely and effectively perform the […]
McMillan Hospital-Air Handling Unit Service Interruption 9/14/2023
The air handler that serves floors 2,3,4,5, and 9 is out of service. Facilities are working on the necessary repairs. These floors will experience warmer than normal temperatures. A follow-up notification will be sent when the unit has been restored.
Cancer Research Building-Fire Alarm Service Interruption 9/21/2023
On Thursday, September 21st 9:00-11:30 am Facilities will be testing the Audio/Visuals for the Fire Alarm System on the 4th and 5th floor of the Cancer Research Building as part of the final inspection. During this time, you will hear messages and see strobes throughout the entire building, occupants do not need to leave the […]
Mallinckrodt Institute Radiology-Air Handling Unit Service Interruption 9/25/2023
On Monday, September 25th 3:30-8:00 pm Facilities will be testing the fire alarm system for the air handlers throughout the entire building during the above-noted dates and times. Each air handler will be off for a short period of time. Customers should not experience any extreme temperature changes during this outage.
Mallinckrodt Institute Radiology-Air Handlers Service Interruption 9/27/2023
On Wednesday, September 27th 3:30 – 8:00 pm Facilities will be checking the fire alarm system for the air handlers throughout the entire building during the above-noted dates and times. Each air handler will be off for a short period of time. Customers should not experience any extreme temperature changes during this outage.
Mallinckrodt Institute Radiology-Elevator Service Interruption 10/8/2023
Elevator 102 will be out of service on Sunday, October 8, at 8 am for 4 hours to perform preventive maintenance. The elevator will be back on service at noon.