Clinical Sciences Research Building-Hot Water Service Interruption 1/26/2024

On Friday, January 26th 2-10 am Facilities will be assisting contractors with draining the heating hot water for the 7th floor. The temperatures for the air handler supply will be raised to provide heat to the entire floor. The entire floor may experience cooler-than-normal temperatures during this time.

CSRB North Tower Addition-451/461 ABSL3 Suite Service Interruption 2/26/2021

On Monday, February 26th 6:00 am – 10:00 pm Johnson Controls will be replacing the network control engine that serves 451/461 ABSL3 suite. NO work may occur in the 451/461 ABSL3 suite during this outage. Other ABSL3 suites in the 4th floor biohazard area will be available during this outage.

CSRB North Tower Addition-432/442 ABSL3 Suite-Service Interruption 2/19/2024

On Monday, February 19th 6:00 am – 10:00 pm Johnson Controls will be replacing the network control engine that serves 432/442 ABSL3 suite. NO work may occur in the 432/442 ABSL3 suite during this outage. All other ABSL3 suites in the 4th floor biohazard area will be available during this outage.

Neuroscience Research Building-Vacuum Service Interruption 2/3/2024

The vacuum system for the NRB building will be out of service for upgrades and repairs on February 3rd 6:00 am – 3:00 pm. During this time anything attached to vacuum will not be in service. Please make sure that any experiments or equipment that uses vacuum is scheduled around this outage. Sorry for any […]