On Saturday, October 26, from 6 am to 2 pm, contractors will turn off air handlers serving floors, lower levels 2, and 9, and sections 3, 4, and 5 to make necessary repairs. During the above-noted dates and times, these areas will experience a loss of airflow and fluctuating temperatures.
McMillan Hospital-Air Handling Unit Service Interruption 10/19/2024
On Saturday, October 19th 7 am – 5 pm contractors will turn off the air handler serving the lower level to make necessary repairs. The lower level will notice fluctuations in temperatures and airflow.
McMillan Hospital-Air Handling Unit Service Interruption 10/13/2024
On Sunday, October 13th, 7 am – 5 pm contractors will turn off the air handler serving the lower level to make necessary repairs. During the above-noted dates and times, the lower level will notice fluctuations in temperatures and airflow.
McMillan Hospital-Air Handling Unit Service Interruption 10/12/2024
Contractors will turn off the air handler serving the lower level to make necessary repairs. During the above-noted dates and times, the lower level will notice fluctuations in temperatures and airflow.
East Building roof replacement update
Workers began the replacement of the East Building’s roof on September 9th. The demolition phase has been completed. The roof replacement is scheduled for October 7th – November 4th, during the hours of 7 am – 5 pm. There will be a series of crane picks throughout the project. All crane picks will occur from […]
McKinley Avenue closure on October 19 and 20
McKinley Avenue will close on October 19th and 20th between the 4522 McKinley building and the 718 S. Euclid parking lot entrance. This closure will allow for a crane to remove air-handling equipment from the roof of the McDonnell Science Building. A flagger will direct traffic at the corner of McKinley and S. Taylor. There […]
Wohl Clinic and Wohl Hospital restrooms upgrades
Wohl Clinic and Wohl Hospital restroom upgrades will occur between Monday, September 30 and Friday, November 29th. This project will require a dumpster on the north side of BJCIH (see the diagram). United Construction will place a dumpster in the highlighted section below for the project’s duration. The dumpster will not impede traffic and should […]
Construction fencing installation on the east side of BJCIH
Starting on October 7th, construction fencing will be installed around the BJCIH utility vault on the east side of the building (see map). This will facilitate the addition of a new roof over the vault to address persistent leaks into the Metrolink tunnel. This work will take approximately four months. Thank you for your cooperation […]
Clayton Garage Elevator update
Midwest Elevator will be completed with Clayton Garage elevator #60 on October 31st, finishing the north group of elevators. Immediately thereafter, the Clayton Garage south group of elevators #58 and #59 will begin remodeling one at a time. Each elevator will take ~17 weeks to remodel. The South group of elevators will be under construction […]
Overnight closure of main north/south corridor of Wohl Hospital on October 1st for floor repairs
There will be an overnight closure starting at 6 pm on October 1st and ending at 6 am on October 2nd for the lower level of Wohl Clinic at the main North/South corridor of Wohl Hospital for floor repairs. This corridor intersection will be completely off-limits during this time. Please see the map showing the […]