May 20-August: Barnard Exhaust Fan Replacement

Bernhard Engineering/ENFRA will begin investigating the entire Barnard exhaust fan #3 system throughout the building. This will consist of an ENFRA/Bernhard Engineer walking around the whole building and following the ductwork through the ceilings to create an as-built of the system. They will remove ceiling tiles and look above the ceilings as needed throughout the […]

May 20-June 9: BJCIH Utility Vault Roof Drain Routing on Euclid Avenue

Starting at 5 am on May 20th, Tarlton will begin work to route the new roof drain lines from the BJCIH utility vault to the city sewer system. This project includes saw cutting and removing a section of sidewalk and roadway along Euclid Avenue near the Central West End MetroLink. The saw cutting will occur […]